DATE INDUSTRY PROJECT CLIENT SCOPE
2014 offshore Transocean Barents KVÆRNER STORD Welding and fitting work during upgrade and modification of the mobile H6e drilling rig Transocean Barents at Kværner shipyard in Stord, Norway
since 2014 przemysl_petrogazowy Nyhamna KVÆRNER STORD NDT testing, welding and fitting work during construction of pipe racks at Kværner shipyard in Stord, Norway
since 2014 subsea MOHO NORD SUBSEA & DALIA AKER EGERSUND Welding inspection (IWI-C & IWE) during construction of subsea compression system for TOTAL E&P Angola
2014 offshore GINA KROG Jacket Heerema Fabrication Group Welding work during the fabrication of transport construction for steel jacket of an offshore platform
since 2013 offshore GINA KROG TOPSIDE EPCH AKER ENGINEERING & TECHNOLOGY/ AKER ADVANTAGE Quality Surveillance, material and welding supervision and technical documentation control
2013 – 2014 offshore MARTIN LINGE JACKET KVÆRNER VERDAL Welding and fitting work during the construction of support structures (jackets) for the Martin Linge offshore platform in Kværner Shipyard in Verdal, Norway
2012 offshore GUDRUN EPCH AIBEL Welding and fitting work during the prefabrication stage of the deck structure and modules for an offshore platform
2012 subsea ASGARD Subsea AKER EGERSUND/ Crist Offshore Inspectoral supervision of NDT testing, inspectoral supervision of welding works (IWI, IWE), welding and fitting work during the realization of two sub-projects – Asgard Topside Module and Asgard Subsea Compression
2012 offshore BELUGA Crist Welding work on the construction of the specialist ship Beluga. This ship is a hydro-technical unit, a so-called Heavy Lift jack up Vessel with a heavy hoisting system for the construction and operation of offshore wind farms
2011 offshore Ekofisk 2/4 Z & Eldfisk 2/7 S Mostostal Pomorze/ Aker Solutions Qualification of welding technologies (WPS / WPQR), NDT testing, welding supervision and preheating during the prefabrication of structures and modules for offshore platforms
2011 offshore GUDRUN EPCH AIBEL Welding supervision during the prefabrication stage of the deck structure and modules for an offshore platform
2011 offshore ANHOLT Transformer platform Mostostal Pomorze/ Blatd Industries Welding supervision and  NDT testing
2010 – 2011 budownictwo GDANSK AIRPORT TERMINAL Gdansk Shipyard NDT testing of a roof structure
2010 przemysl_petrogazowy Kollsnes KOP EPC Aker Stord/ Aker Offshore Partner Prefabrication of pipelines (welding and fitting work) and NDT testing during the construction of the Kollsnes gas terminal
2010 przemysl_petrogazowy European CO2 TCM – EPC Amine Plant (Mongstad) Aker Stord/ Aker Offshore Partner Involving the staff of WNS Pomorze in welding and assembly works and NDT testing during the prefabrication of pipelines
2007 przemysl_stoczniowy Maritim Comprehensive X-ray of vessels – NDT testing
2006 przemysl_stoczniowy Ferry Vessel Crist NDT testing
2005 Vetco Aibel – Huldra Mostostal Pomorze NDT testing
2005 przemysl_stoczniowy Maritim Comprehensive X-ray of vessels – NDT testing
2005 budownictwo International Paper Welding works and PWHT of industrial installations
2005 przemysl_petrogazowy Remont Inst. Grupy Lotos S.A. Grupa Lotos Welding works, NDT testing, and PWHT
2005 offshore ABB – Riser Guide Support Mostostal Pomorze NDT testing
2004 przemysl_petrogazowy Piec 900F2 Grupa Lotos Prace spawalnicze, badania NDT, oraz PWHT
2004 przemysl_petrogazowy Chemical Plant – Police Welding works and PWHT of industrial installations
2004 offshore National Oilwell – Main & Knuckle Booms Mostostal Pomorze NDT testing
2004 Kalmar Industries Mostostal Pomorze NDT testing of gantry cranes

Projects carried out by MOSTOSTAL GDAŃSK S.A.

DATE INDUSTRY PROJECT CLIENT SCOPE
2002 offshore KVITEBJORN – Flare Tower ABB Offshore Systems Prefabrication works – steel: 280 t (S355 – S500); additional materials for welding: 6 t; welding method: 136, maximum thickness: 50 mm
2002 budownictwo Olympiastadion Berlin DSD Dillinger Stahiban GmbH Prefabrication and assembly works – steel: 3000 t (material group: 1 and 3); additional materials for welding pipes: 3 t; welding method: 111; maximum thickness: 200 mm
2001 budownictwo KVITEBJORN ABB Offshore Systems Prefabrication works – steel structures: 3500 t (S355 – S500); additional materials for welding: 70 t; welding methods: 136, 121; maximum thickness: 66 mm
2001 budownictwo Messehalle 3 Frankfurt/M Plauen Prefabrication and assembly works – steel: 5000 t (S355); additional materials for welding pipes: 20 t; welding method: 136, maximum thickness: 80 mm
2001 budownictwo 2 storage tanks 75.000 m3 Mozyr Belarus Prefabrication and assembly works – steel: 5,000 t; additional materials for welding: 90 t; welding methods: 136, 121; maximum thickness: 60 mm
2000 budownictwo Crane GOLIATH Man Takraft (for shipyard Odense) Prefabrication and assembly works – steel structures: 3,500 t (S355); additional materials for welding: 50 t; welding methods: 111, 136, 121; maximum thickness of metal sheet: 60 mm
1998 offshore Jotun Kværner Prefabrication works – steel: 500 t (S355, S420)
1998 offshore ASGARD B Kværner OIL&GAS Prefabrication works – sections of steel structures: 4800 t (S355, S420); additional materials for welding: 80; welding methods: 111, 135, 136, 121; maximum thickness: 60 mm
1998 offshore OSEBERG SOR Aker Maritime Prefabrication works – sections of steel structures: 1300 t (S355, S420); additional materials for welding: 18 t; welding methods: 111, 136, 121; maximum thickness of metal sheet: 60 [mm]
1998 przemysl_petrogazowy Reforming VI Petrochemia Plock Prefabrication and assembly works: piping systems 500 t; materials: A106 Gr.B, A355 P11 304L, 316L; service: heat treatment PWHT
1998 – 1999 przemysl_petrogazowy Hydrokracking Rafineria Gdansk Prefabrication and assembly works: piping systems 1300 t; materials: A106 Gr.B, A355 P11 304L, 316L; service: heat treatment PWHT
1994 – 1998 przemysl_petrogazowy Hydrocracking Gudron Petrochemia Plock piping systems: 1500 t; materials: A106 Gr.B, A333, P11, P22, P9, Tp347H, 304L, 316L Inconel; service: heat treatment PWHT
do góry