projects

PREFABRICATION OF VENTILATION DUCTS FOR POLISH customer

june 2020 - august 2020

Prefabrication of stainless and carbon steel ventilation ducts
Passivation and painting of pipelines

Johan Castberg, AP100, AQ 100

epg for KVÆRNER
january 2020 - july 2020

Comprehensive installation of stainless steel pipelines 316L, DUPLEX,       SUPER DUPLEX, SMO,TYTAN  – approx. 35 T
Passivation of welds
Welding of welding joints
Colour coding

Johan Sverdrup

KVÆRNER
august 2019 - july 2020

Prefabrication of stainless steel pipelines 316L, DUPLEX,                                SUPERDUPLEX approx. 160T
Passivation and painting of pipelines
NDT 100% RT, VT, PT, PMI testing

Johan Castberg

KVÆRNER
July 2019 - December 2019

Prefabrication of stainless steel pipelines 316L, DUPLEX, SUPER                    DUPLEX, approx. 40 T
Passivation and painting of pipelines
NDT 100% RT, VT, PT and PMI testing

WELDING OF AXIONS FOR THE POLISH CUSTOMER

SEPTEMBER 2019

Welding of structural elements for customers from Poland
NDT testing

TANA BRU bridge

NORWAY
JULY 2019 - SEPTEMBER 2019

Prefabrication of stainless protective barriers of the bridge and                   drainage elements about 15T
Making of stainless steel  316L – 880 mb
Performing surface treatment by soda ash

smo pipelines

JUNE 2019 - SEPTEMBER 2019

Prefabrication of SMO stainless steel pipelines
Performing NDT tests and passivation of welds
Pressure tests

Prefabrication of steel elements for offshore modules

JUNE 2019 - AUGUST 2019

Assembly and welding of structures approx. 50T
Performing NDT tests

Johan Castberg, Johan Sverdrup

KVÆRNER
december 2018 - november 2019

Prefabrication of culverts and drainage wells made of stainless steel          SUPERDUPLEX approx. 60T
Cutting, winding, assembly and welding
NDT tests and passivation of welds
Performing surface cleaning and securing with a protective layer of            Teflon
Shipment of finished items

PREFABRICATION OF SPOOLS

FLUENTA
JULY 2018 - NOVEMBER 2019

Constant, cyclical production of specialized spools for measuring                instruments
Passivation and painting of spools
NDT testing
Packing in crates prepared for shipping

JOHAN CASTBERG, JOHAN SVERDRUP

KVÆRNER
MARCH 2018 - OCTOBER 2019

Prefabrication of DUPLEX stainless steel and carbon steel pipe support culverts approx. 140T
Cutting, assembly and welding
NDT tests and passivation of welds
Performing surface cleaning and securing with a protective layer of            Teflon
Shipment of finished items

Prefabrication of frames for devices, systems and structures for the energy industry

SEPTEMBER 2018 – JANUARY 2019

Permanent prefabrication of carbon and stainless steel frames
Performing NDT tests
Painting the structure

EXECUTION of transport platforms for the recipient from France

DECEMBER 2018

Prefabrication of several platforms with a rotating mechanism
General mechanical engineering
Trial assembly and tests

Johan Castberg

AUGUST 2018 - DECEMBER 2018

Prefabrication of pipelines for the Johan Castberg project
Assembly and welding of steel structures for a Polish client,                          approx. 45T
NDT testing

Prefabrication of fan elements

JULY 2018 - DECEMBER 2018

Prefabrication of industrial fan elements – approx. 55T
Coiling and welding of steel sheets and blades

PALFINGER MARINE NORWAY AS

APRIL 2018

Welding work and fitting
Hire of engineering, production and research personnel

????????????????

PROJECT VAN OORD CSD ARTEMIS

NOVEMBER 2017 - DECEMBER 2017

Welding work and fitting
Heating elements (PWHT)
NDT and DT testing
Hire  of engineering, production and research personnel

NJORD

Kværner Stord
JUNE 2017 - AUGUST 2017

Manufacturing and fitting of steel structures and pipelines
NDT and DT testing
Hire  of engineering, production and research personnel

NJORD

asgard/edvard grieg/moho/dalia

aker solutions egersund
FEBRUARY 2016 - APRIL 2016

Manufacturing and fitting of steel structures and pipelines
Engineering services
Hire  of engineering, production and research personnel

nyhanmna

Kværner Stord
JUNE 2015 - SEPTEMBER 2015

Manufacturing and fitting of steel structures and pipelines
Engineering services and technical supervision
NDT and DT testing
Hire  of engineering, production and research personnel

NYHAMNA

nordman maximus

reel
FEBRUARY 2014 - JULY 2016

Welding work and fitting
Heating elements (PWHT)
NDT and DT testing
Hire  of engineering, production and research personnel

EDVARD GRIEG

Kværner Stord, Kværner Verdal, Aker Advantage, Crist Offshore, Vistal Gdynia, Mostostal Pomorze
JUNE 2013 - MAY 2015

Manufacturing and fitting of steel structures and pipelines
Engineering services and technical supervision
NDT and DT testing
Hire  of engineering, production and research personnel

TROLL A TPC34 EPCIC

Aibel, Mostostal Pomorze
SEPTEMBER 2012 - JULY 2013

Engineering services and technical supervision
NDT and DT testing
Hire  of engineering, production and research personnel

EKOFISK 2/4 Z

Aker Egersund
SEPTEMBER 2012 - JUNE 2013

Production and fitting of pipelines
Hire  of production personnel

ELDFISK 2/7 S EPC TOPSIDE

Kværner Stord, EPG, Vistal, MPO
JUNE 2012 - SEPTEMBER 2013

Manufacturing and fitting of steel structures and pipelines
Engineering services and technical supervision
NDT and DT testing
Thermal treatment
Hire  of engineering, production and research personnel

CLAIR RIDGE DP & QU JACKET

Kværner Stord, Kværner Verdal
MARCH 2012 - JUNE 2013

Manufacturing and fitting of steel structures and pipelines
Engineering services and technical supervision
NDT and DT testing
Hire  of engineering, production and research personnel

AMPHITHEATER IN SOPOT

Alstal
2011

Manufacturing and fitting of steel structures and pipelines
Thermal treatment
NDT and DT testing
Hire of production and research personnel

Goliath Development

Aker Solutions, Hydromechanika
2011

Production and fitting of pipelines
Engineering services and technical supervision
NDT and DT testing
Hire of production and research personnel

FPSO Voyager

EPG, Sevan Marine Norway
2011

 Production and fitting of pipelines
 Engineering services and technical supervision
 NDT and DT testing
 Hire of production and research personnel

Program 10+

Mostostal Pomorze
2008 - 2010

Manufacturing and fitting of steel structures and pipelines
Engineering services and technical supervision
NDT and DT testing
Thermal treatment
Hire  of engineering, production and research personnel

GJØA SEMI EPCH

Aker Stord, Aker Offshore Partner, MPO
2008 - 2010

Manufacturing and fitting of steel structures and pipelines
Engineering services and technical supervision
NDT and DT testing
Thermal treatment
Hire  of engineering, production and research personnel

H6e DRILLING RIGS – Spitsbergen & Barents

Aker Stord, Aker Offshore Partner, EPG, MPO, SHCM
2008 - 2010

Manufacturing and fitting of steel structures and pipelines
Engineering services and technical supervision
NDT and DT testing
Thermal treatment
Hire  of engineering, production and research personnel

Ormen Lange

Aker Stord, Mostostal Pomorze
2005 - 2007

Manufacturing and fitting of steel structures and pipelines
Hire of  research personnel